Our specialists are constantly exploring the strength of the newly designed units, parts, components on test benches. All certified construction. Go to Viacom for more information. LSTC – alternative to long and expensive construction. Quickly, efficiently and inexpensively. This is not a cheap construction, but not expensive. To date, 200 projects implemented. We have built a complex of Presentation 2600 m2na South-West Wastewater Treatment Plant. From issuing a sketch of the project to date has only been 45 days.
The work of architects, designers, manufacturing and installation of metal was carried out almost simultaneously. In August 2005, we produced and mounted collapsible exhibition pavilion for the company "Transas" at the International Aviation and Space Salon "MAKS-2005" in the town of Zhukovsky. Built shopping malls in the city of Vyborg, Vsevolozhsk, Sosnovy Bor, Kronstadt. In Kronstadt, the building was erected for 1.5 months. – In Nevelsk in Sakhalin, we constructed two three-storey house. Built 3-storey house in Nizhnevartovsk.
Russian Emergencies Ministry building and a tennis court in St Petersburg, the building of "Toyota Center" in Salekhard, car show in Pskov, a lot of houses in the vicinity of St. Petersburg, the add-attic in Pskov and St. Petersburg, in particular, two-story apart-hotel "Kronverk", etc. The use of load-bearing frame of light steel sections (light steel thin-walled structures – LSTC) lined gypsum board and mineral wool as insulation or filled with insulating foam concrete today – the most effective and economically cost-effective technology low-rise construction of prefabricated buildings and structures. The choice of material for the walls of the facade of this technology is wide enough – brick, siding, block-house, tiles, plastering, etc.